When schedules are tight and site conditions are complex, Hexagon’s installation crews deliver scaffolds built right the first time. We plan with care, starting with a site walk, risk assessment, and method statement, then set out base prep, tie patterns, access routes, and load paths to keep the build safe and efficient. From façade access and full enclosures to interior birdcages, stair towers, and shoring, our trained erectors build under experienced supervision and hand over with tagging, usage notes, and an inspection schedule that keeps you compliant.
Throughout the project, we remain responsive to changes, making adjustments as other trades progress and dismantling cleanly when work is complete. We coordinate with your program to minimize disruption, including night or weekend builds when required. If you also need design support or stamped calculations, our Engineering team steps in to provide drawings, optimization, and professional review. Share your drawings and dates, and we’ll return a practical build plan with a firm mobilization window.


